top of page
Pavement Reconstruction
A full scale pavement reconstruction is recommended when the pavement is so deteriorated that all of the asphalt and some of the subbase must be removed and replaced.
-
A complete pavement reconstruction may be necessary if:
-
There is clear damage to the sub-base.
-
Alligator or block cracking is prevalent.
-
The pavement is not able to support current traffic loads.
-
There are water or drainage problems.

bottom of page